|
|
Please use this identifier to cite or link to this item:
https://repositorio.utn.edu.ec/handle/123456789/19015Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Cotacachi, Francisco | - |
| dc.contributor.author | Saraguro, Ramiro | - |
| dc.contributor.author | Lema Cáceres, Edgar Vinicio | - |
| dc.contributor.author | Benavides Flores, Karen Alejandra | - |
| dc.date.accessioned | 2026-02-25T23:24:39Z | - |
| dc.date.available | 2026-02-25T23:24:39Z | - |
| dc.date.created | 2024-12-14 | - |
| dc.date.issued | 2026-02-25 | - |
| dc.identifier.issn | 2367-3370 | - |
| dc.identifier.uri | https://repositorio.utn.edu.ec/handle/123456789/19015 | - |
| dc.description.abstract | Lean Manufacturing se centra en el cliente mediante la identificación de actividades que no agregan valor, los desperdicios y su eliminación o reducción a través de la optimización de procesos y la mejora continua. La empresa textil objeto de estudio fabrica prendas de vestir y busca establecer un método organizacional para su proceso productivo enfocado en la mejora continua mediante el uso de herramientas de Lean Manufacturing. La propuesta se enfoca en el “conjunto simple”, producto compuesto por camiseta y pantalón o short, que constituye la principal línea de producción de la empresa. Específicamente, el estudio se centra en el proceso de fabricación de la camiseta y en su tiempo de ciclo. Los resultados muestran que, mediante la implementación de 5S, la eficiencia de producción mejoró del 58% al 95%. Con la aplicación del Mantenimiento Productivo Total (TPM), se redujeron las interrupciones del flujo productivo en el área de producción. Además, al eliminar los tiempos muertos, el Lead Time disminuyó de 1361 minutos a 1254 minutos. La propuesta plantea reducir el tiempo de procesamiento de 804,55 a 685,42 minutos, lo que permitiría incrementar la capacidad de producción de 1.116 a 1.181 unidades mensuales. Todo ello contribuirá a disminuir los tiempos improductivos y a satisfacer completamente la demanda mensual del cliente. Las empresas textiles de la zona trabajan bajo condiciones de proceso similares, por lo que el estudio podría replicarse en contextos industriales semejantes. | es_EC |
| dc.language.iso | spa | es_EC |
| dc.publisher | Springer Nature Link | es_EC |
| dc.rights | openAccess | es_EC |
| dc.rights | Atribución-NoComercial-CompartirIgual 3.0 Ecuador | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | * |
| dc.subject | PROCESO DE FABRICACIÓN | es_EC |
| dc.subject | FLUJO | es_EC |
| dc.subject | PROCESAMIENTO DE DATOS | es_EC |
| dc.title | Reducción de desperdicios mediante la aplicación de la metodología lean manufacturing en una industria textil: un estudio de caso | es_EC |
| dc.type | Article | es_EC |
| dc.description.degree | N/A | es_EC |
| dc.coverage | Ibarra-Ecuador | es_EC |
| dc.contributor.orcid | https://orcid.org/0000-0002-6244-5246 | es_EC |
| dc.contributor.orcid | https://orcid.org/0000-0002-1387-8555 | es_EC |
| dc.contributor.orcid | https://orcid.org/0000-0001-5038-9980 | es_EC |
| dc.title.en | Waste Reduction Applying Lean Manufacturing Methodology in a Textile Industry. A Case Study | es_EC |
| dc.subject.en | MANUFACTURING PROCESS | es_EC |
| dc.subject.en | FLOW | es_EC |
| dc.subject.en | DATA PROCESSING | es_EC |
| dc.description.abstract-en | Lean Manufacturing focuses on the customer by identifying non-value-added activities, wastes, and their elimination or reduction through process optimization and continuous improvement. The textile company under investigation manufactures clothing and seeks to establish an organizational method for its production process focused on continuous improvement using lean manufacturing tools. The proposal is about the “simple set”, products composed of t-shirt and pant or short, as the main product of the company, specifically focusing on the t-shirt manufacturing process and its cycle time. The results show that by using 5S production improved from 58% to 95% with TPM, production flow interruptions in the production area were reduced, and by eliminating downtime, Lead Time decreased from 1361 min to 1254 min. The proposal aims to reduce the processing time from 804.55 to 685.42 min, which would increase production capacity from 1,116 to 1,181 units per month. All of this will reduce unproductive times and fully meet the monthly customer demand. The textile companies in the area work with processes under similar conditions, so the study could be replicated. | es_EC |
| dc.identifier.doi | https://link.springer.com/book/9783031707599 | es_EC |
| Appears in Collections: | Artículos | |
Files in This Item:
There are no files associated with this item.
This item is protected by original copyright |
This item is licensed under a Creative Commons License